205 |
01.10.2016 |
Not running
|
Change volume and take profit |
下载
|
|
204 |
01.08.2016 |
Not running
|
Change volume and time frame |
下载
|
|
203 |
01.08.2016 |
Comp. error
|
Change volume and time frame |
下载
|
|
202 |
01.08.2016 |
Comp. error
|
Change volume and time frame |
下载
|
|
201 |
01.07.2016 |
Not running
|
Change volume and tp with sl |
下载
|
|
201 |
01.07.2016 |
Executed
|
Change volume and tp with sl |
下载
|
|
200 |
16.06.2016 |
Executed
|
Change volume and tp with sl |
下载
|
|
200 |
16.06.2016 |
Not running
|
Change volume and tp with sl |
下载
|
|
60 |
18.08.2015 |
Executed
|
Final good optional version for this month |
下载
|
|
57 |
13.08.2015 |
Executed
|
Change in trading volume, time frame changes,
changes take profit and stop loss, due to a
possible reversal of the trend of the previous
stop loss could result in failure to reach the
desired 20 transactions during the month of
trading as a condition. |
下载
|
|
56 |
13.08.2015 |
Comp. error
|
Change in trading volume, time frame changes,
changes take profit and stop loss, due to a
possible reversal of the trend of the previous
stop loss could result in failure to reach the
desired 20 transactions during the month of
trading as a condition. |
下载
|
|
55 |
13.08.2015 |
Comp. error
|
Change in trading volume, time frame changes,
changes take profit and stop loss, due to a
possible reversal of the trend of the previous
stop loss could result in failure to reach the
desired 20 transactions during the month of
trading as a condition. |
下载
|
|
54 |
17.07.2015 |
Not running
|
Test HIGH volume |
下载
|
|
53 |
01.06.2015 |
Executed
|
Retest |
下载
|
|
52 |
01.05.2015 |
Executed
|
Retest |
下载
|
|
51 |
29.04.2015 |
Executed
|
Test for new edition |
下载
|
|
50 |
18.04.2015 |
Executed
|
Retest high volume |
下载
|
|
49 |
17.04.2015 |
Executed
|
retest |
下载
|
|
48 |
16.04.2015 |
Executed
|
TEST NEW VOLUME |
下载
|
|
47 |
16.04.2015 |
Executed
|
volume test |
下载
|
|
46 |
16.04.2015 |
Executed
|
test high tp volume |
下载
|
|
45 |
16.04.2015 |
Executed
|
Test High tp volume |
下载
|
|
44 |
16.04.2015 |
Executed
|
High TP volume testing |
下载
|
|
43 |
01.04.2015 |
Not running
|
retest |
下载
|
|
42 |
31.03.2015 |
Not running
|
Retest |
下载
|
|
41 |
02.03.2015 |
Executed
|
Otipn high risk volume |
下载
|
|
40 |
28.02.2015 |
Executed
|
Optional high risk volume |
下载
|
|
39 |
05.02.2015 |
Executed
|
For test new parameters |
下载
|
|
38 |
02.02.2015 |
Executed
|
Test AUD/USD February |
下载
|
|
37 |
01.01.2015 |
Not running
|
Test for January 2015 |
下载
|
|
36 |
06.12.2014 |
Not running
|
Changing the volume with a new modification of the
TP and SL. |
下载
|
|
35 |
29.11.2014 |
Executed
|
Optionally, EURUSD is ideal for a test on this
strategy for this month. |
下载
|
|
34 |
07.11.2014 |
Not running
|
Changes TP and other parameters |
下载
|
|
33 |
03.11.2014 |
Executed
|
Test new parameters |
下载
|
|
32 |
15.10.2014 |
Not running
|
New test |
下载
|
|
31 |
30.09.2014 |
Executed
|
Change Value Pair |
下载
|
|
30 |
18.09.2014 |
Not running
|
Change value pair |
下载
|
|
15 |
15.08.2014 |
Not running
|
Change pair |
下载
|
|
14 |
14.08.2014 |
Executed
|
Change value pair |
下载
|
|
13 |
01.08.2014 |
Executed
|
Optional pair NZDUSD to test. |
下载
|
|
12 |
04.06.2014 |
Not running
|
Test new set of parameters, such as the timeframe,
take profit, stop loss, and a new adjustment in
monitoring the main trend. |
下载
|
|
11 |
02.06.2014 |
Executed
|
Changes TP with SL and volume |
下载
|
|
10 |
21.04.2014 |
Not running
|
TP and volume |
下载
|
|
9 |
01.01.2014 |
Executed
|
New test |
下载
|
|
8 |
21.11.2013 |
Not running
|
New test |
下载
|
|
7 |
16.10.2013 |
Not running
|
New performance optimization |
下载
|
|
6 |
30.09.2013 |
Executed
|
New testing |
下载
|
|
5 |
01.09.2013 |
Not running
|
New parameters for testing |
下载
|
|
4.1 |
20.08.2013 |
Not running
|
Testing 2 |
下载
|
|
4 |
31.07.2013 |
Executed
|
New test |
下载
|
|
v3 |
10.07.2013 |
Executed
|
New parameters |
下载
|
|
v2 |
02.07.2013 |
Executed
|
New parameters |
下载
|
|
v1 |
30.06.2013 |
Executed
|
New visual start |
下载
|
|