| Version: | Datum: | Status: | Beschreibung: | ||
| 205 | 01.10.2016 | Not running | Change volume and take profit | Download | |
| 204 | 01.08.2016 | Not running | Change volume and time frame | Download | |
| 203 | 01.08.2016 | Comp. error | Change volume and time frame | Download | |
| 202 | 01.08.2016 | Comp. error | Change volume and time frame | Download | |
| 201 | 01.07.2016 | Not running | Change volume and tp with sl | Download | |
| 201 | 01.07.2016 | Executed | Change volume and tp with sl | Download | |
| 200 | 16.06.2016 | Executed | Change volume and tp with sl | Download | |
| 200 | 16.06.2016 | Not running | Change volume and tp with sl | Download | |
| 60 | 18.08.2015 | Executed | Final good optional version for this month | Download | |
| 57 | 13.08.2015 | Executed | Change in trading volume, time frame changes, changes take profit and stop loss, due to a possible reversal of the trend of the previous stop loss could result in failure to reach the desired 20 transactions during the month of trading as a condition. | Download | |
| 56 | 13.08.2015 | Comp. error | Change in trading volume, time frame changes, changes take profit and stop loss, due to a possible reversal of the trend of the previous stop loss could result in failure to reach the desired 20 transactions during the month of trading as a condition. | Download | |
| 55 | 13.08.2015 | Comp. error | Change in trading volume, time frame changes, changes take profit and stop loss, due to a possible reversal of the trend of the previous stop loss could result in failure to reach the desired 20 transactions during the month of trading as a condition. | Download | |
| 54 | 17.07.2015 | Not running | Test HIGH volume | Download | |
| 53 | 01.06.2015 | Executed | Retest | Download | |
| 52 | 01.05.2015 | Executed | Retest | Download | |
| 51 | 29.04.2015 | Executed | Test for new edition | Download | |
| 50 | 18.04.2015 | Executed | Retest high volume | Download | |
| 49 | 17.04.2015 | Executed | retest | Download | |
| 48 | 16.04.2015 | Executed | TEST NEW VOLUME | Download | |
| 47 | 16.04.2015 | Executed | volume test | Download | |
| 46 | 16.04.2015 | Executed | test high tp volume | Download | |
| 45 | 16.04.2015 | Executed | Test High tp volume | Download | |
| 44 | 16.04.2015 | Executed | High TP volume testing | Download | |
| 43 | 01.04.2015 | Not running | retest | Download | |
| 42 | 31.03.2015 | Not running | Retest | Download | |
| 41 | 02.03.2015 | Executed | Otipn high risk volume | Download | |
| 40 | 28.02.2015 | Executed | Optional high risk volume | Download | |
| 39 | 05.02.2015 | Executed | For test new parameters | Download | |
| 38 | 02.02.2015 | Executed | Test AUD/USD February | Download | |
| 37 | 01.01.2015 | Not running | Test for January 2015 | Download | |
| 36 | 06.12.2014 | Not running | Changing the volume with a new modification of the TP and SL. | Download | |
| 35 | 29.11.2014 | Executed | Optionally, EURUSD is ideal for a test on this strategy for this month. | Download | |
| 34 | 07.11.2014 | Not running | Changes TP and other parameters | Download | |
| 33 | 03.11.2014 | Executed | Test new parameters | Download | |
| 32 | 15.10.2014 | Not running | New test | Download | |
| 31 | 30.09.2014 | Executed | Change Value Pair | Download | |
| 30 | 18.09.2014 | Not running | Change value pair | Download | |
| 15 | 15.08.2014 | Not running | Change pair | Download | |
| 14 | 14.08.2014 | Executed | Change value pair | Download | |
| 13 | 01.08.2014 | Executed | Optional pair NZDUSD to test. | Download | |
| 12 | 04.06.2014 | Not running | Test new set of parameters, such as the timeframe, take profit, stop loss, and a new adjustment in monitoring the main trend. | Download | |
| 11 | 02.06.2014 | Executed | Changes TP with SL and volume | Download | |
| 10 | 21.04.2014 | Not running | TP and volume | Download | |
| 9 | 01.01.2014 | Executed | New test | Download | |
| 8 | 21.11.2013 | Not running | New test | Download | |
| 7 | 16.10.2013 | Not running | New performance optimization | Download | |
| 6 | 30.09.2013 | Executed | New testing | Download | |
| 5 | 01.09.2013 | Not running | New parameters for testing | Download | |
| 4.1 | 20.08.2013 | Not running | Testing 2 | Download | |
| 4 | 31.07.2013 | Executed | New test | Download | |
| v3 | 10.07.2013 | Executed | New parameters | Download | |
| v2 | 02.07.2013 | Executed | New parameters | Download | |
| v1 | 30.06.2013 | Executed | New visual start | Download | |