Please consider implementing the ability to set pause points in back testing. For example, if I am running a back test from Oct 1 2013 to Oct 1 2014, I want to be able to pause on the first of every month to record the test results and possibly change the test parameters manually before resuming the test run. This would be a powerful feature to allow testers to collect data throughout the test run instead of only at the end of the run.